Technology for High-End Residences with Sergey Rekutin

Technology for High-End Residences with Sergey Rekutin

Sergey Rekutin, President of Cravtsman, an AV and home technology integration firm, recently spoke with Design 2147 CEO Sisto Martello about the technology approaches used in high-end residential projects.

Q: What does your work involve, and how do you work with architects and designers?

A: We basically take the input from the client, who has certain standards of what their life should feel like, how comfortable they should be, and that’s grounded a lot in technology. They need good Wi-Fi, they want to have music everywhere, and so on. And then we take all that information, and we bring it to the architect or the people who design the space, because they typically spend a lot of time on small details. And we just give them the list: this is what the client wants, and we typically get, “Absolutely not. We are not putting any of that stuff in there.” And then we say, “We can make it very pretty.”

Q: How do you hide technology in older New York buildings, where there’s often no room to recess anything?

A: All our work is essentially trying to meet design intent with technology requirements. We’re just putting them together. So sometimes with construction obstacles, like with no ceiling depth. We work in New York City, so there’s a lot of buildings. The wall construction is made out of plaster and just brick, so there’s no depth to the ceiling. You can’t recess anything. So we would find something very unique. Like we have little speakers that are made out of solid metals that can be trimmed into the millwork of the windows, and they completely disappear or kind of blend in. So we find a way to bring the tech required for the space into the fold in a way that when you walk into the room, it doesn’t distract from the design.

Q: What about light switches and other visible hardware?

A: We sometimes have clients that can spend an enormous amount of money on simple things like hinges for the doors, and then matching door handles, and they just don’t want a plastic switch next to those things. So we would go back to the manufacturers that make these specialty switches, and we try to match finishes so they brush the same way and look the same way. So if you’d like to have brass-finished switches on the wall, we have to build a Lutron system in the back of it in order for it to work. If you’d like brass-finished switches on the wall, we have to build a Lutron system in the back to make it work.

Q: Can you give an example of a tricky retrofit?

A: Right now, we’re working on a project in a townhouse in the Upper West Side, and literally every inch of that space is covered in art. It’s serious art. They have down lighting that we need to retrofit because we have to swap out lighting control, so they can’t really use incandescent stuff anymore. And now the client is asking for us to provide wall washers that will fit exactly in the same opening that’s already there. She does not want to do any kind of construction, because moving that artwork alone will probably cost more than the whole construction process. We had to bring lighting design into it. We’re trying to work out some systems on how to do it. We’ll see. But yes, those things come up quite often.

Q: How did you end up in this niche?

A: I have a system electronics and engineering degree. When I graduated school, the economy tanked because the dot-com bubble burst, so I couldn’t find any work. I went to work as a cable guy here in Time Warner Cable, but I was bored out of my mind, so I started a little computer service business. It very quickly became very nichey. I started to do support for medical imaging services, like MRI, X-ray, and so on. Those guys have made a bunch of money, so they started to buy all the TVs. And they would call me and say, “Hey, go install this, ’cause you’re my tech guy.” Very quickly that snowballed into the whole business. I had to hire a person, and then it took over my side gig, and then it took over my job. Over eight years or so, we started to focus on pure high-end. Now that’s all we focus on, and then we just keep climbing even more and more.

Q: Custom products can have long waits. How do you manage lead times?

A: The QA is definitely sometimes an issue. We have this wonderful company. I think we are the first ones who installed it in New York City, and the lead time is now six months because almost 50% of the product that they make, they make light switches, very custom, and they doesn’t pass QC. And they can’t fix it. They just have to keep making the product until they get it right. And then they send it over, and it’s like a six-month wait, and you never know. So it’s very hard to manage. We’ve worked a lot on figuring out how we can get to these details fast enough so we can put the orders ahead of time.

Q: How do you see the current market, including talk of new taxes and part-time owners?

A: Honestly, I don’t really think about it. All I really focus on is just getting work done. But I tell you what, we’re super busy. We’re up from last year by quite a bit. What I can tell is that the top end of the market is very strong for us anyway. And we see new money come in as well. Like, we see AI money come in now. With so few young people buying from us, it’s so refreshing to actually start working with the younger folks. I feel like New York City is now grabbing a lot of technology talent and bringing it over from West Coast to East Coast, and money follows with that. I don’t know if that’s particular, but from what I can tell, it’s very strong.

Q: Where does your work happen in a project’s schedule?

A: I would say 50% of our work is design, just going through details, working things out. And then execution typically happens between when drywall goes up and people move in. So that’s kind of our execution timeframe. That’s very quick and very intense as well.

Q: What keeps your team motivated?

A: It’s not easy, but it’s super rewarding. The sense of reward from completing the project is amazing. I think this is what brings a lot of people to our industry, because it’s almost instant gratification. It takes 18 months to build a project, but you see it from sticks to the end, and then you move the person in, and it’s just amazing to see.